2. Site selection and preparation

The location of your spa is entirely up to you. Read these instructions for ideas of the various locations that your new spa may be installed.

  • By the time you have purchased your spa, you have likely already picked your location. Prior to the spa delivery, please verify the following:
  • Always place the spa on a compacted, level surface. The best surface is a level concrete pad. A spa, full of water, can weigh a great deal. Please ensure that the spot can support the weight.
  • Make sure that your spa is level before it is filled.
  • Locate the equipment panel. The system pack, drain valve, and ozone generator are usually located in the same area. Be sure that the connections are tightened during filling. Water inside the system pack will cause the pack to fail, and the breaker to trip.
  • The panels, located on all four sides, are removable. Be sure that you have access to all four panels.
  • Be sure to have easy access to the circuit breaker in the sub panel (240 volt models).
  • Never let water into the sub panel (240 volt models), or into the electrical outlet that your spa is plugged in to. If you have 240 volt model, the spa’s sub panel is rain tight when installed correctly with the door closed.